GERMANY �Brummbar� Mid production In early 1942, Alkett finished up being purchased to make and create a brand new Sturmpanzer with Krupp's cooperation. Alkett are at price of creating the sloped armor superstructure mounting a 150mm assault/attack howitzer, that's become included with a normal Panzerkampfwagen IV framework modified by Krupp. Since all past vehicles, particularly Sturmhaubitze 42 (Sd.Kfz.142/2) and Stug 33, was at fact considered in the same way short-term models ("interim solution"), Albert Speer ordered the growth of Sturmpanzer IV. Really, the Stug 33 can be viewed as the direct forerunner of Brummbar.
Specification
Copyright © 2008-2024 rcjaz.co.uk All rights reserved